Jump to content

The_aSSet Build: Round 2!


The_aSSet

Recommended Posts

Milled .012 for 12.5:1 scr , ported exhaust, and valve job. Porting everything would've been 1500 and I wasn't about to do that lol so just that stuff was only 650. Plus the l92/ls3 intake valves and ports are gigantic as is, figured it'd even them out a bit.

Link to comment
Share on other sites

Well while waiting on my engine and finally getting inside my truck. I decided to try to finally put in my tablet in the center console cubby thing.

 

Here!

d8e6ef90-62b2-6237.jpg

 

Tablet!

d8e6ef90-62d4-d39b.jpg

tri-booting!

d8e6ef90-62ec-2c04.jpg

 

Fiberglass holder, not done yet.

d8e6ef90-6340-2527.jpg

d8e6ef90-634e-914f.jpg

 

Fiberglass holder will be attached to the stock cubby holder so it will still snap in like stock(ish) it had to be cut so the tablet would face me more

d8e6ef90-641a-cc55.jpg

d8e6ef90-6384-2a1f.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...